Проектно- -сметное дело В-4.doc
📂 For Education Students
👤 al_ac
Product Description
Task №1. To determine the estimated cost and the estimated cost of the works for laying linoleum on the underlying basis teplozvukoizoliruyuschey thickness of 3.6 mm under the following conditions.
Terms Data in thous. (For option)
1 2 3 4 5 6 7 8 9 10
1. costs
on
materials (M)
2. The basic monthly salary (RFP)
3. The costs of operating the machinery (EM)
56.35
5.42
0.10
84.52
8.13
0.15
90.18
8.63
0.16
95.79
9.24
0.17
101.43
9.76
0.18
107.07
10.30
0.19
112.7
10.84
0.20
118.3
11.3
0.21
123.97
11.92
0.22
129.6
12.47
0.23
This task is recommended to perform on 2.2 "the estimated cost structure." It is necessary to clarify the concept of the estimated cost and the cost of construction, part of the direct costs, the procedure for calculating the value of the overhead of civil works and the procedure for determining the amount of planned savings.
Terms Data in thous. (For option)
1 2 3 4 5 6 7 8 9 10
1. costs
on
materials (M)
2. The basic monthly salary (RFP)
3. The costs of operating the machinery (EM)
56.35
5.42
0.10
84.52
8.13
0.15
90.18
8.63
0.16
95.79
9.24
0.17
101.43
9.76
0.18
107.07
10.30
0.19
112.7
10.84
0.20
118.3
11.3
0.21
123.97
11.92
0.22
129.6
12.47
0.23
This task is recommended to perform on 2.2 "the estimated cost structure." It is necessary to clarify the concept of the estimated cost and the cost of construction, part of the direct costs, the procedure for calculating the value of the overhead of civil works and the procedure for determining the amount of planned savings.
Additional Information
Task № 2. Determine the estimated cost of construction of an auto repair shop under the following conditions.
This task is recommended to perform on 2.2 "the estimated cost structure." It is necessary to clarify the concept of the estimated cost of installation work, the composition of the direct costs, the procedure for calculating the value of the cost of installation and the procedure for determining the value of the planned savings.
Terms Data in thous. (For option)
brick monolith team.
w / w window
(Wooden)
floors
top
finishing
Zem.rab metal.
Konstr Protection page. Konstr.
1 2 3 4 5 6 7 8 9 10
1. The cost of the materials (M)
2.Core
wages (ZPO)
3.Zatraty to operate machines and
mechanisms (EM)
4. Wages serving machines
(PAZ) 193.7
16.8
10.50
4.20 212.60
18.48
11.55
4.62 231.92
20.16
12.6
5.04 251.25
21.84
13.65
5.46 274.78
23.52
14.7
5.88 289.91
25.2
15.75
6.3 309.23
26.88
16.8
6.72 328.56
28.56
17.87
7.14 154.62
13.44
8.40
3.36 173.94
17.84
9.45
3.78
This task is recommended to perform on 2.2 "the estimated cost structure." It is necessary to clarify the concept of the estimated cost of installation work, the composition of the direct costs, the procedure for calculating the value of the cost of installation and the procedure for determining the value of the planned savings.
Terms Data in thous. (For option)
brick monolith team.
w / w window
(Wooden)
floors
top
finishing
Zem.rab metal.
Konstr Protection page. Konstr.
1 2 3 4 5 6 7 8 9 10
1. The cost of the materials (M)
2.Core
wages (ZPO)
3.Zatraty to operate machines and
mechanisms (EM)
4. Wages serving machines
(PAZ) 193.7
16.8
10.50
4.20 212.60
18.48
11.55
4.62 231.92
20.16
12.6
5.04 251.25
21.84
13.65
5.46 274.78
23.52
14.7
5.88 289.91
25.2
15.75
6.3 309.23
26.88
16.8
6.72 328.56
28.56
17.87
7.14 154.62
13.44
8.40
3.36 173.94
17.84
9.45
3.78
No Reviews Yet
Be the first to leave a review for this product!
Related Products
Solution of the K3 Option 10 Dievskaya VA Malyshev IA
Seller: TerMaster
Solution K5 B1 termehu of Reshebnik Yablonsky AA 1978
Seller: TerMaster
Solution of the D1 Option 10 Dievskaya VA Malyshev IA
Seller: TerMaster
Solution of the K4 version 05 Dievskaya VA Malyshev IA
Seller: TerMaster
Solution of the K3 Option 11 Dievskaya VA Malyshev IA
Seller: TerMaster
Solution of task 4.3.14 from the collection of Kepe OE
Seller: Михаил_Перович
Solution of task 4.2.13 from the collection of Kepe OE
Seller: Михаил_Перович
C2 Option 11 termehu of Reshebnik Yablonsky AA 1978
Seller: TerMaster