The scheme of reducing the speed of the bridge crane in

📂 Energetics 👤 Дмитрий I

Product Description

Proposal to limit the speed of the bridge crane when approaching the marginal zone of the shop. With asynchronous motors with a phase rotor. Near the parking zone of the crane, a boom is installed, which switches the limit switch on the crane bridge to a position that excludes all speeds on the controller, except the minimum one.

Additional Information

The file in Compass-15 format
Price: $1.12
Seller: Дмитрий I
Category: Energetics
Currency: USD

Secure payment via oplata.info

No Reviews Yet

Be the first to leave a review for this product!

Related Products

More from this Seller