The project of the kindergarten in the part of architec
📂 Drawings
👤 RPLAY
Product Description
The project made the following decisions:
Exterior walls - facing with facing ceramic bricks with jointing.
Basement - cladding with terracotta ceramic tiles with joint jointing.
Roof and visors - metal "MONTREY" with a polymer coating.
Metal products should be painted with PF-115 enamel for 2 times on the layer of the primer GF-021.
Format - DWG, compatible with AutoCAD 2007-2017, Compass, ZWCAD, nanoCAD, BricsCAD, etc.
Exterior walls - facing with facing ceramic bricks with jointing.
Basement - cladding with terracotta ceramic tiles with joint jointing.
Roof and visors - metal "MONTREY" with a polymer coating.
Metal products should be painted with PF-115 enamel for 2 times on the layer of the primer GF-021.
Format - DWG, compatible with AutoCAD 2007-2017, Compass, ZWCAD, nanoCAD, BricsCAD, etc.
No Reviews Yet
Be the first to leave a review for this product!
Related Products
RUOM reactor installation project
Seller: RPLAY
Проект резервуарной установки СУГ
Seller: RPLAY
ASB basic elements ES
Seller: RPLAY
ASB elements of safety systems facilities RD 78.36.
Seller: RPLAY
Water symbols
Seller: RPLAY
Elements of Civil Defense and Emergencies
Seller: RPLAY
Symbols for system KNX
Seller: RPLAY
ЭС Аппараты защиты
Seller: RPLAY