Working project for heating and ventilation of service

📂 Drawings 👤 RPLAY

Product Description

The project provides for the heating of the service station with public premises from the boiler house. The building has 2 heating systems designed. Heating system N1 (public premises) - two-pipe, vertical with the top wiring. Heating system N2 (production zone) - two-pipe, horizontal with a dead-end coolant movement.
The project developed general exchange supply and exhaust ventilation with mechanical and natural motivation and local suction from the process equipment. Air exchange in the premises is calculated according to the multiplicities, according to normative documents and on the technological assignment. Air is fed into the working area, removing from the upper zone. To capture dust from the grindstone grinder, a dust collection unit of the ZIL-900M type is installed.

The format is DWG, compatible with AutoCAD 2004-2017, Compass, ZWCAD, nanoCAD, BricsCAD, etc.
Price: $0.59
Seller: RPLAY
Category: Drawings
Currency: USD

Secure payment via oplata.info

9
Sales

No Reviews Yet

Be the first to leave a review for this product!

Related Products

RUOM reactor installation project

Seller: RPLAY
189 RUB
Sold: 2

ASB basic elements ES

Seller: RPLAY
100 RUB
Sold: 1

Water symbols

Seller: RPLAY
200 RUB
Sold: 1

Elements of Civil Defense and Emergencies

Seller: RPLAY
50 RUB
Sold: 1

Symbols for system KNX

Seller: RPLAY
150 RUB
Sold: 1

ЭС Аппараты защиты

Seller: RPLAY
70 RUB
Sold: 1

More from this Seller